[32], Once the east and west reaches were inter-connected with opening of the underground section of the purple line, ridership surged hugely. The BMRC earned a total of 6.6 crore (US$830,000) during the same period. [119][120] These stretches (including the underground section) were inaugurated by then President late Shri Pranab Mukherjee on 17 March 2017.[121][122]. [33], Phase 1 comprises two lines spanning a length of 42.30 kilometres (26.28mi), of which about 8.82 kilometres (5.48mi) is underground and about 33.48 kilometres (20.80mi) is elevated. BMRCL secured loans from several agencies 3,000 crore (US$380million) from the Japan International Cooperation Agency (JICA), 600 crore (US$75million) from the Housing and Urban Development Corporation Limited (HUDCO), 25 crore (US$3.1million) from the Asian Development Bank (ADB), and the rest from the French Development Agency. Actually, here you will get the first train or last train information of Source station only. [136] Land acquisition for Phase 1 accounted for 2,500 crore (US$310million). The tunneling faced a major delay when the cutter head of TBM Godavari was broken and spares had to be awaited. The financial forecast assumes a government subsidy for interest payments and some depreciation, i.e. 1549 cr contract from BMRCL", "BMRCL awarding 14-km metro contracts to ITD & Afcons", "L&T launches tunneling works for Bangalore metro", "Bengaluru: Metro underground tunnel work on Cantonment, Tannery Road stations begins", "Metro line from Silk Board to KR Puram to be fast-tracked", "Metro link to Outer Ring Road: BMRC unveils DPR, invites suggestions", "Karnataka Cabinet approves ORR metro line", "Bangalore: Setback for techies as BMRCL cancels ORR project tender | Bengaluru News - Times of India", "Namma Metro ORR line tender receives 14 bids", "Namma Metro Outer Ring Road line tender receives 14 bids", "DPR for Metro link to BIA in five months", "Bangalore Metro Rail yet to decide on route for Airport Line", "Now, suggest a Namma Metro route to the airport", "Central funding brightens prospects of metro line to Bengaluru airport", "Bengaluru wants KIA Metro line via Nagawara", "Bengaluru Metro airport line to now run through Hebbal", "Airport Metro line gets one station but loses another", "Karnataka government clears suburban rail project, Metro to airport | Bengaluru News - Times of India", "Huge relief in sight for techies, flyers as Centre clears ORR-Airport Line for Bengaluru", "Complete Bengaluru Metro Phase 2 by 2024: Karnataka CM Basavaraj Bommai | Bengaluru News - Times of India", "Metro pillar crash: Sudden loss leaves Bengaluru family shattered", "Bengaluru metro structure falls; techie, kid killed", "What caused the under-construction metro pier in Bengaluru to fall? . 50. [59], The total awarded tunneling tenders for the underground sections was 5,925.95 crores (appx US$812 million).[60][61][62]. Water will be collected from the 190,000 sq foot roof and stored in two tanks with a capacity of 50,000 litres each. [166], In September 2009, the consortium led by Alstom Project India Limited was awarded a contract worth 563.4 crore (US$70.6million) to supply control and signalling system for the first phase of the project. . [9] Namma Metro has a mix of underground, at grade, and elevated stations. of stations, contact number , last metro timing, first metro timing and gates Info. [129], On 9 June 2022, Karnataka Government okayed preparation of DPR by Tamil Nadu government for an extension of the Yellow line from Bommasandra to Hosur in Tamil Nadu.[130]. [150] On average, 41,390 people took the train every day, while the average daily revenue was 667,262. [41][42] However, there were delays in DPR preparation and hence approval from Central government. The loan marked the multilateral lending agency's foray into the urban transport sector in South Asia, the ADB said in a press release. [147], Indian firms Biocon and Infosys announced that they would provide funding for the construction of the Hebbagodi and Electronics City metro stations respectively on the RV Road-Bommasandra Metro line. This committee had again recommended the same metro project put forward by SR in 1983 and the same circular railway. So the first train is at 09:24 AM and the last train is at: 09:24 PM from Nangloi. [226] The app was developed by the Centre for Development of Advanced Computing (CDAC). Is Feeder bus facility available at RK Puram metro station? Find local businesses, view maps and get driving directions in Google Maps. [44] The State Government would contribute 9,000 crore (US$1.3 billion). Ridership kept increasing and was around 4,50,000 daily (September 2019). BMRTL commissioned a feasibility study which came up with an elevated, LRT-based, 300km (190mi) long network on 6 routes. [74] The proposed extension routes had an average length of 30km (19mi), and cost estimates ranged between 4,500 crore and 7,000 crore. After the northsouth underground section was opened (simultaneously with the elevated reach 4,4A in the south), the network provided connectivity in all four directions with interchange between the lines and this further increased ridership. Thus Phase 3 will likely be for a total of about 80 km. The projected ridership on both these lines in 2026 is estimated at 7.7 lakhs. The system runs on standard-gauge tracks. Metro Fare; View Map; Nearest Metro Station; . From: To: Show Route and Fare: Fare (Rs.) It is estimated to cost 10,584 crore (US$1.5 billion) almost twice as much as the previous route's estimate of 5,950 crore (US$830 million). [159] The first six car train was introduced on the Purple Line on 23 June 2018. . [217] Services remained limited throughout the pandemic period and ridership was low due to enforcement of constrained capacity and social distancing norms, as stipulated by the state government. [47] Phase 2 includes extension of the two Phase 1 lines in both directions, as well as construction of two new lines. [215], As ridership kept growing, overcrowding became a serious concern. The metro service runs between 05:00 and 23:00 hours. The BMRCL had not informed of the drill in advance. [206][207], In November 2016, BMRC began accepting online payments to recharge smart cards.
Metro Route from Nangloi to R.K.Puram - Road Distance Between Cities [99][100], Bommasendra to Hosur Railway station(extension of Yellow line) 22 km to be included in phase 3. Transition planned from DTG to CBTC depot (for Blue line trains)[176], *Land includes two stations (Channasandra & Kadugodi), The BMRC granted permission to Hydrobloom, a start-up company, to grow hydroponic plants on the pillars of the Namma Metro. [68] A second round of tendering was done during December 2019 and bids were received by multiple firms during March 2020. Karnataka government gave in-principle approval to Phase 2 of the Namma Metro project on 3 January 2012. Yellow tactile tiles are used at all stations to guide the visually impaired. RK Puram Delhi Metro Station. The entire stretch of the Purple Line was opened on 29 April 2016. [136] BMRCL secured 6,500 crore (US$810million) through long-term loans and 300 crore (US$38million) by selling bonds, while the remaining cost was funded by Central Government and the State Government. [52][non-primary source needed], Construction work for the north extension of the Green Line (from Nagasandra to Madavara) and the east extension of the Purple Line (from Baiyyappanahalli to Whitefield) began in July 2017. The Line passes through prime activity centers of the city (MG Road, Majestic, Railway Station, Vidhana Soudha etc.). Here's all you need to know", "Bengaluru: Covid-hit Metro operator plans to raise Rs 500 crore | Bengaluru News - Times of India", "RDSO in no hurry to allow Metro to up speed", "Namma Metro security cover to soon get a boost", "Mock drill at Metro stations takes passengers aback", "Commuters' brush with etiquette on Namma Metro", "New app for Namma Metro once Phase 1 gets fully operational", "Metro trial run between National College, Puttenahalli in 3 weeks", "Puneeth Rajkumar, Adah Sharma shoot at MG Road Metro Station, Bangalore - Times of India", "Allow WFH till Dec 2022 to help Bengaluru Metro work: K'taka govt to IT firms", "Karnataka govt retracts WFH advisory for IT companies along Bengaluru Outer Ring Road after backlash", https://en.wikipedia.org/w/index.php?title=Namma_Metro&oldid=1162791578, Bengaluru Metro Rail Corporation Limited (BMRCL), Operational 69.66km (43.28mi) ; Features include stainless steel body fully air-conditioned coaches, longitudinal bank of wide seats, wide vestibules between coaches, non-skid and non-slip floor surfaces, wi-fi enabled, four wide passenger access doors on each side, wide windows, automatic voice announcement system and electronic information and destination display system. 50 DMRC, and concessions may apply to smartcards.The first metro from RK Puram to Nangli is 06:07 AM and the last . A major delay was due to a broken cutter head of TBM Godavari for which spares had to be ordered from Italy. Dimensions: Length-20.8m, Width-2.88m, and Height-3.8m. [15], DPRs for a northern extension (from Yeshwanthapura to Nagasandra) and a southern extension (from Rashtreeya Vidyalaya Road to Yelachenahalli) was submitted in October 2007 and June 2008 respectively. Get information on Metro Route from Nangloi to R.K.Puram,fare, Metro Timing from Nangloi to R.K.Puram with Last & First Metro details. By January 2020, all trains had been converted to six coaches. Namma Metro ("Our Metro" in Kannada), also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, India. [123] The northern extension of 3.8km (2.4mi) to Madavara is due to open in mid-2023.
The second underground section, along with southern reaches (viz. Upon its inauguration, it became the first underground metro system in South India. The first train set made a trial run in December 2010. The facility of feeder bus service is not available at RK Puram metro station. It also passes through Hebbal and Yelahanka. Delhi Metro route from RK Puram To Nangloi Rly Station station. The distance between R.K.Puram to Nangloi is 27.5 km .The metro fare from R.K.Puram to Nangloi is Rs. [173], On 17 February 2017, Uber announced that it would open booking counters at 12 metro stations by the end of March 2017. Once the east and west reaches were inter-connected with the intermediate underground section of Purple line, ridership surged hugely to nearly 100,000 a day on the line in the first few days.
Victoria Secret Bombshell Seduction Perfume,
1600 Park Street Alameda,
Articles N